Projects
The following list represents a very small sample of the more than 1,200 projects successfully carried out by Archaeological Services LLC.
- More than 800 archaeological predetermination surveys throughout Clark County in compliance with the county’s pre-development archaeology ordinance.
- Dozens of surveys for Clark County Public Works through our on-call contract to assist that agency with projects containing an archaeological component. Examples of projects include: Hockinson Meadows Park, 99th Street and 110th Street Stormlines, Bosco Park, Klineline Bridge Replacement Project, and various road improvement projects throughout the county.
- Extensive survey work throughout southeastern Oregon for potential wind farm projects.
- The Tri-City Water Pollution Control Plant Intertie Project, Clackamas County, Oregon. Section 106 survey along roughly 4 miles of proposed pipeline through urban areas.
- Data recovery for the Vancouver Land Bridge Project. Contracted by KPFF Consulting Engineers, Portland, OR and working in consultation with Fort Vancouver National Historic Reserve on $5 million project.
- Section 106 survey for the City of Herminston Wastewater Treatment Plant.
- Cultural Resources Survey of the SE Sunnyside Rd and SE 172nd Avenue Project Area, Clackamas County, OR. Section 106 NEPA Documentation, 2007.
- Archaeological Data Recovery in the Northwest Natural Pipeline Right of Way at the Fort Vancouver Waterfront Complex (45CL163H). Archaeological testing and data recovery along a 5,000-foot pipeline right of way between Fort Vancouver and the Columbia River, 2002-2003.
- More than 20 surveys for telecommunication facilities in Oregon, Washington, and Montana for EBI Consulting, Burlington MA.